RM新时代官方-首页

    <xmp id="9al9n">
  1. <noframes id="9al9n"><noframes id="9al9n"><noframes id="9al9n"><sub id="9al9n"></sub>

      1. <wbr id="9al9n"></wbr><dd id="9al9n"><dd id="9al9n"></dd></dd>

          您好,歡迎光臨萊州聚峰機械有限公司網(wǎng)站! 主營(yíng)自動(dòng)攪拌車(chē),攪拌一體車(chē),自動(dòng)上料攪拌車(chē)等各種規格的產(chǎn)品。

          自動(dòng)上料攪拌車(chē)生產(chǎn)廠(chǎng)家

          點(diǎn)擊撥打服務(wù)熱線(xiàn):4008791999

          自動(dòng)攪拌車(chē)操作施工需要注意哪些細節?

          發(fā)布時(shí)間:2021-02-24 來(lái)源:http://m.jackpetty.net/ 瀏覽量:0

          概述:自動(dòng)攪拌車(chē)操作施工需要注意哪些細節?What details should be paid attention to in the operation and construction of auto
          自動(dòng)攪拌車(chē)操作施工需要注意哪些細節?
          What details should be paid attention to in the operation and construction of automatic mixer?
          1、操作人員一定要持證上崗,禁止將混凝土機械交給無(wú)證人員操作,作業(yè)時(shí)應集中精力,正確操作,不得擅自離崗。
          1. Operators must work with certificates. It is forbidden to hand over concrete machinery to unlicensed personnel for operation. During operation, they should concentrate on correct operation and should not leave the post without authorization.
          2、作業(yè)前應檢查攪拌車(chē)的固定、離合器、制動(dòng)器、滑輪、鋼絲繩、傳動(dòng)裝置、上料斗限位、電氣線(xiàn)路、保護接零或接地線(xiàn)等,如有異常一定要排除。
          2. Before operation, the fixing, clutch, brake, pulley, wire rope, transmission device, upper hopper limit, electrical circuit, protective neutral connection or grounding wire of the mixer should be checked. If there is any abnormality, it must be eliminated.
          3、實(shí)行多班作業(yè)時(shí),應執行交接的制度,交接的人應認真填寫(xiě)交接記錄,交接的人對提升機檢查確認無(wú)誤并簽字后,方可進(jìn)行工作。
          3. When carrying out multi shift operation, the handover system should be implemented. The handover person should fill in the handover record carefully. The handover person can work only after checking and signing the elevator.
                       自動(dòng)攪拌車(chē)
          4、一定要按規定的技術(shù)性能合理使用機械。
          4. The machinery must be used reasonably according to the specified technical performance.
          5、升起上料斗后,料斗下方嚴禁人員進(jìn)入,清理料斗下方時(shí),一定要掛上保險鏈,攪拌桶內有人進(jìn)入清理和維修作業(yè)時(shí),應拉下開(kāi)關(guān)箱內的隔離開(kāi)關(guān),鎖好開(kāi)關(guān)箱,以免誤操作傷人。
          5. After lifting the upper hopper, it is strictly forbidden for personnel to enter the lower part of the hopper. When cleaning the lower part of the hopper, the safety chain must be hung. When someone enters the mixing bucket for cleaning and maintenance, the isolating switch in the switch box should be pulled down and the switch box should be locked to avoid injury caused by misoperation.
          6、作業(yè)完畢,應將機械清理干凈,切斷電源,鎖好開(kāi)關(guān)箱。
          6. After the operation, clean the machinery, cut off the power supply and lock the switch box.
          感謝您的閱讀,希望以上內容對您有所幫助,如想了解更多精彩內容請點(diǎn)擊:自動(dòng)攪拌車(chē)http://m.jackpetty.net。
          Thank you for reading, hope the above content is helpful to you, if you want to know more wonderful content, please click: automatic mixer http://m.jackpetty.net .

          截屏,微信識別二維碼

          RM新时代官方-首页

            <xmp id="9al9n">
          1. <noframes id="9al9n"><noframes id="9al9n"><noframes id="9al9n"><sub id="9al9n"></sub>

              1. <wbr id="9al9n"></wbr><dd id="9al9n"><dd id="9al9n"></dd></dd>

                    <xmp id="9al9n">
                  1. <noframes id="9al9n"><noframes id="9al9n"><noframes id="9al9n"><sub id="9al9n"></sub>

                      1. <wbr id="9al9n"></wbr><dd id="9al9n"><dd id="9al9n"></dd></dd>

                          RM新时代平台靠谱平台入口 rm新时代靠谱的平台 RM新时代 RM公司 RM新时代官方网站 RM新时代投资官网 RM新时代是骗人的吗 新时代app官方版下载 RM新时代官方网站|首入球时间 rm新时代app打不开