RM新时代官方-首页

    <xmp id="9al9n">
  1. <noframes id="9al9n"><noframes id="9al9n"><noframes id="9al9n"><sub id="9al9n"></sub>

      1. <wbr id="9al9n"></wbr><dd id="9al9n"><dd id="9al9n"></dd></dd>

          您好,歡迎光臨萊州聚峰機械有限公司網(wǎng)站! 主營(yíng)自動(dòng)攪拌車(chē),攪拌一體車(chē),自動(dòng)上料攪拌車(chē)等各種規格的產(chǎn)品。

          自動(dòng)上料攪拌車(chē)生產(chǎn)廠(chǎng)家

          點(diǎn)擊撥打服務(wù)熱線(xiàn):4008791999

          不能錯過(guò)的攪拌一體機的操作秘籍!

          發(fā)布時(shí)間:2022-04-08 來(lái)源:http://m.jackpetty.net/ 瀏覽量:0

          概述:     攪拌一體機對保證工程質(zhì)量、提高施工效率起著(zhù)十分重要的作用,但是在施工作業(yè)中也要注意使用攪拌一體機,下面我們就給大家介
            
            攪拌一體機對保證工程質(zhì)量、提高施工效率起著(zhù)十分重要的作用,但是在施工作業(yè)中也要注意使用攪拌一體機,下面我們就給大家介紹下攪拌一體機的操作方面的注意事項。
            All in one stirring machine plays a very important role in ensuring the quality of the project and improving the efficiency of the construction, but we should also pay attention to the safe use of all in one stirring machine in the construction operation. Here we will introduce the precautions for the operation of all in one stirring machine.
            將攪拌一體機行駛停放到工作區,拉好手剎將檔位撥空擋熄火;下車(chē)觀(guān)察攪拌一體機所在位置是否在堅實(shí)的地面上,盡量將攪拌一體機停在泵送臂架工作范圍內。觀(guān)察好地形后,將電控箱操作面板上的行車(chē)開(kāi)關(guān)轉換泵送位置,啟動(dòng)底盤(pán)發(fā)動(dòng)機,將底盤(pán)檔位掛到6檔。檢查各處的急停開(kāi)關(guān)是否打開(kāi)。
            The mixing machine will drive and park to the working area, pull the handbrake to switch to neutral and flameout; Get off to observe whether the position of the all-in-one stirring machine is on the solid ground, and try to stop the all-in-one stirring machine within the working range of the pumping arm. After observing the terrain, switch the running switch on the operation panel of the electric control box to the pumping position, start the chassis engine, and put the chassis gear into 6th gear. Check whether emergency stop switches are on everywhere.
            將臂架支腿轉換開(kāi)關(guān)切換到支腿位置,在依次將六條泵機支腿展開(kāi)。展開(kāi)支腿時(shí),應注意將支腿下方墊木方,必須用支承板或輔助方木來(lái)增大支承表面積,并保持整車(chē)的平衡。將臂架支腿轉換開(kāi)關(guān)切換到臂架位置,將大臂伸開(kāi)。
            Switch the boom leg switch to the leg position and expand the six pump legs in turn. When the legs are expanded, attention should be paid to the wooden pad under the legs. Supporting plates or auxiliary square wood must be used to increase the supporting surface area and maintain the balance of the vehicle. Switch the boom leg transfer switch to the boom position and extend the big arm.
            拔出攪拌機定位銷(xiāo),將攪拌機推動(dòng)到工作位置,插好定位銷(xiāo)。放下上料斗上下滑道,連接好固定螺栓。注意:下滑道應與地面接觸并保持受力,懸空易導致滑道變形。
            Pull out the positioning pin of the mixer, push the mixer to the working position, and insert the positioning pin. Lower the upper hopper up and down the slideway and connect the fixing bolts. Note: the slide should be in contact with the ground and keep the force, hanging easy to cause deformation of the slide.
            檢查發(fā)電機組空氣開(kāi)關(guān)是否處于斷開(kāi)狀態(tài)。如帶負荷啟動(dòng),或影響發(fā)電機消磁。調整油門(mén)發(fā)電機組儀表正常狀態(tài)。
            Check whether the generator set air switch is off. Such as load start, or affect the generator demagnetization. Adjust throttle to generator set instrument normal condition.
            泵送工作開(kāi)始:鏟車(chē)沙子4包水泥攪拌均勻后放入攪拌一體機料斗等待;攪拌混凝土;開(kāi)始泵送砂漿,再將攪拌好的混凝土放入料斗連續泵送避免堵管。
            Start pumping work: forklift sand 4 bags of cement mixing evenly into the mixing machine hopper waiting; Mixed concrete; Start pumping mortar, and then mix the concrete into the hopper continuous pumping to avoid blocking the pipe.
            清洗工作:打開(kāi)攪拌一體機料斗卸料門(mén),將料斗內的混凝土清理干凈;打開(kāi)攪拌機卸料門(mén)沖洗料斗;打開(kāi)出料口根180彎頭上的觀(guān)察口,塞入海綿球后關(guān)閉觀(guān)察口;將攪拌一體機料斗注滿(mǎn)水,啟動(dòng)泵送將海綿球泵送出管道;打開(kāi)料斗卸料門(mén),將臂架垂直立起,S管擺中位,放掉管道里的水。
            Cleaning work: open the hopper unloading door of the mixing machine, clean the concrete in the hopper; Open the discharging door of the mixer to flush the hopper; Open the observation port on the first bend 180 of the discharge port, insert the sponge ball and close the observation port; Fill the hopper of the mixing machine with water, and start pumping to pump the sponge ball out of the pipe; Open the hopper discharge door, erect the boom vertically, place the S tube in the middle position, and drain the water in the pipe.
            關(guān)閉發(fā)電機組:斷開(kāi)空氣開(kāi)關(guān);將發(fā)電機組柴油機轉速降低速運轉30秒后關(guān)閉發(fā)電機組。
            Turn off the generator set: disconnect the air switch; Turn down the diesel engine speed of the generator set to low speed for 30 seconds and then close the generator set.
            收車(chē):將攪拌機收到行車(chē)狀態(tài),插好定位銷(xiāo);收臂架;收支腿。將底盤(pán)檔位撥空擋,將轉換開(kāi)關(guān)切換行車(chē)狀態(tài)。
            Car: the blender received the running state, plug the positioning pin; Revenue boom; Balance of payments. Switch the chassis gear to neutral and switch the driving state.
            所以這才說(shuō)不能錯過(guò)的攪拌一體機的操作秘籍!當然要想攪拌一體機使用前后不會(huì )出現大的問(wèn)題,那么在平常中就要做好的相關(guān)的準備工作以及檢查工作,更多內容就來(lái)m.jackpetty.net/咨詢(xún)吧。
            So this is to say that can not miss the operation of the all-in-one mixing machine secrets! Of course, if you want to use the all-in-one mixing machine before and after there will not be a big problem, then in the usual time to do the relevant preparation and inspection work, more content to m.jackpetty.net/ consultation.

          截屏,微信識別二維碼

          RM新时代官方-首页

            <xmp id="9al9n">
          1. <noframes id="9al9n"><noframes id="9al9n"><noframes id="9al9n"><sub id="9al9n"></sub>

              1. <wbr id="9al9n"></wbr><dd id="9al9n"><dd id="9al9n"></dd></dd>

                    <xmp id="9al9n">
                  1. <noframes id="9al9n"><noframes id="9al9n"><noframes id="9al9n"><sub id="9al9n"></sub>

                      1. <wbr id="9al9n"></wbr><dd id="9al9n"><dd id="9al9n"></dd></dd>

                          RM新时代平台靠谱平台入口 rm新时代靠谱的平台 RM新时代 RM公司 RM新时代官方网站 RM新时代投资官网 RM新时代是骗人的吗 新时代app官方版下载 RM新时代官方网站|首入球时间 rm新时代app打不开