自動(dòng)攪拌車(chē)是一種將水泥,砂骨料和水混合并混合成混凝土混合物的機器。它主要包括攪拌桶,進(jìn)料和卸料機構,供水系統,原動(dòng)機,傳動(dòng)裝置,框架和支撐裝置。由于只有合理的設備操作才能提高設備的性能,以下小編將介紹設備的操作程序。
An automatic mixer is a machine that mixes cement, sand, aggregate and water into a concrete mixture. It mainly includes mixing drum, feeding and discharging mechanism, water supply system, prime mover, transmission device, frame and supporting device. Since only safe and reasonable operation of the equipment can improve the performance of the equipment, the following section will introduce the safe operation procedures of the equipment.
1.在駕駛之前,您必須仔細檢查自動(dòng)攪拌車(chē)的狀況,以確保車(chē)輛能夠駕駛。
1. Before driving, you must carefully check the condition of the automatic mixer to ensure that the vehicle can drive safely.
2.當自動(dòng)攪拌車(chē)停放在露天時(shí),應在充電前翻轉攪拌筒,并排干水和碎屑,以確?;炷恋馁|(zhì)量。
2. When the automatic mixer truck is parked in the open air, the mixing drum should be turned over before charging, and the water and debris should be drained to ensure the quality of concrete.
3.運輸混凝土時(shí),確保傾斜槽牢固放置,防止其因松動(dòng)而擺動(dòng),行人在行駛過(guò)程中可能受傷或影響其他車(chē)輛的正常運行,同時(shí)注意避免混凝土溢出和污染地面。
3. When transporting concrete, ensure that the inclined trough is firmly placed to prevent it from swinging due to looseness, and pedestrians may be injured or affect the normal operation of other vehicles in the process of driving. At the same time, attention should be paid to avoid concrete spilling and polluting the ground.
4.從自動(dòng)攪拌車(chē)運輸混凝土的時(shí)間不得超過(guò)攪拌站規定的時(shí)間。在運輸混凝土的途中,攪拌筒不應長(cháng)時(shí)間停止,以防止混凝土分離。駕駛員應始終注意具體情況,并在發(fā)現異常時(shí)通知主控室并申請。
4. The time for transporting concrete from the automatic mixer truck shall not exceed the time specified by the mixing plant. During the transportation of concrete, the mixing drum shall not be stopped for a long time to prevent concrete separation. The driver should always pay attention to the specific situation and inform the main control room and apply for treatment when abnormal conditions are found.
5.當混凝土安裝在車(chē)內時(shí),現場(chǎng)的停滯時(shí)間不得超過(guò)1小時(shí)。如果超時(shí),應要求網(wǎng)站負責人及時(shí)處理。
5. When the concrete is installed in the vehicle, the site stagnation time shall not exceed 1 hour. In case of overtime, the person in charge of the website shall be required to deal with it in time.
6.當從自動(dòng)攪拌車(chē)中非抽水時(shí),從混凝土到水箱的時(shí)間不應超過(guò)2小時(shí),并且必須在超過(guò)2小時(shí)后排出。當陰雨天氣溫度低時(shí),不應超過(guò)2.5小時(shí)。
6. When not pumping water from the automatic mixer, the time from the concrete to the water tank shall not exceed 2 hours and must be discharged after more than 2 hours. When the temperature is low in rainy weather, it should not exceed 2.5 hours.
7.在排出混凝土之前,攪拌筒應以10-12 rpm的速度旋轉1分鐘然后排出。
7. Before discharging the concrete, the mixing drum should be rotated at a speed of 10-12 rpm for 1 minute and then discharged.
8.由于自動(dòng)攪拌車(chē)的進(jìn)料結束,進(jìn)料口,卸料斗和卸料槽應沖洗并排干,以去除附著(zhù)在閥體上的污垢和殘留混凝土。保持車(chē)輛衛生。
8. Since the feeding of the automatic mixer is finished, the feed inlet, discharge hopper and discharge tank shall be flushed and drained to remove dirt and residual concrete attached to the valve body. Keep the vehicle clean.
任何機械設備在操作和使用過(guò)程中都需要一定的操作過(guò)程。在運行期間了解自動(dòng)攪拌車(chē)的操作程序非常重要。我希望每個(gè)人都必須根據上述知識正確操作和使用它。
Any mechanical equipment in the operation and use process need a certain safety operation process. It is very important to know the safe operation procedure of the automatic mixer during operation. I hope everyone must operate and use it correctly according to the above knowledge.
對于自動(dòng)攪拌車(chē)的操作規程介紹了解情況就是這樣了,希望對你有幫助。
For the introduction of automatic mixer safety operating procedures, understand the situation is like this, hope to help you.