概述:操作是攪拌一體車(chē)完成其工作任務(wù)的基本保證,也是攪拌車(chē)操作、維修和周?chē)┕と藛T人身的可靠保證。那么在操作攪拌車(chē)時(shí)應注意哪些準
操作是
攪拌一體車(chē)完成其工作任務(wù)的基本保證,也是攪拌車(chē)操作、維修和周?chē)┕と藛T人身的可靠保證。那么在操作攪拌車(chē)時(shí)應注意哪些準確規范內容呢?
Safe operation is the basic guarantee for the mixer to complete its work tasks, as well as the reliable guarantee for the operation, maintenance and personal safety of surrounding construction personnel. So what precise specifications should we pay attention to when operating the integrated mixer?
1.蓄電池
1. Battery
蓄電池只能用氮氣沖洗,不能用氧氣、氫氣等易燃易爆氣體沖洗。
The battery can only be flushed with nitrogen, not oxygen, hydrogen and other flammable and explosive gases.
2.應急關(guān)閉按鈕
2. Emergency shutdown button
輸送泵車(chē)上設有一系列緊急停車(chē)按鈕,分別設置在支腿控制閥、有線(xiàn)無(wú)線(xiàn)遙控系統和控制箱之上。在緊急情況之下,只需按下其中一個(gè)應急關(guān)機按鈕,機器就可以關(guān)機。如果應急停機按鈕出現故障,機器在緊急情況下不能急速停機。
A series of emergency stop buttons are set on the delivery pump truck, which are respectively set on the outrigger control valve, wired wireless remote control system and control box. In an emergency, just press one of the emergency shutdown buttons to shut down the machine. If the emergency stop button fails, the machine cannot be shut down quickly in an emergency.
因此,每次開(kāi)始工作后務(wù)必要檢查應急關(guān)閉按鈕的功能。當按下應急停機按鈕時(shí),機器的電氣系統被切斷,導致電磁閥關(guān)閉等,如果液壓系統出現泄漏,會(huì )導致動(dòng)臂下沉等問(wèn)題,按下應急停機按鈕無(wú)法。
Therefore, it is necessary to check the function of the emergency shutdown button after each start of work. When the emergency stop button is pressed, the electrical system of the machine is cut off, causing the solenoid valve to close, etc. if the hydraulic system leaks, it will cause problems such as boom sinking, which cannot be solved by pressing the emergency stop button.
3.抽水作業(yè)
3. Pumping operation
啟停泵時(shí),應與末端軟管的操作人員聯(lián)系,末端軟管的彎曲半徑不小于1m,不允許彎曲;在拆卸堵塞的管道后,應將其泵回2-3次,確認管道無(wú)殘余壓力之后再拆卸。
When starting and stopping the pump, contact the operator of the end hose. The bending radius of the end hose is not less than 1m, and bending is not allowed; After dismantling the blocked pipeline, pump it back for 2-3 times and confirm that there is no residual pressure in the pipeline before dismantling.
4.動(dòng)臂操作
4. Boom operation
當動(dòng)臂從折疊狀態(tài)伸出或縮回時(shí),務(wù)必要按指定次序執行。動(dòng)臂回轉操作務(wù)必要在動(dòng)臂全然離開(kāi)動(dòng)臂支架之后進(jìn)行。當風(fēng)速為16-17ms,處于風(fēng)暴狀態(tài)或風(fēng)速達到8級或超過(guò)時(shí),不得使用吊桿。動(dòng)臂不得用于提升操作。
When the boom extends or retracts from the folded state, it must be carried out in the specified order. The boom rotation operation must be carried out after the boom completely leaves the boom support. When the wind speed is 16-17ms, it is in a storm state or the wind speed reaches level 8 or more, the suspender shall not be used. The boom must not be used for lifting operations.
5.術(shù)后檢查
5. Postoperative examination
吊桿應在吊桿支架之上全然縮回;支腿也應全然縮回,并插入鎖銷(xiāo)??刂婆_的電源開(kāi)關(guān)應處于“關(guān)閉”位置。
The suspender should be completely retracted on the suspender support; The outrigger should also be fully retracted and the locking pin inserted. The power switch of the console should be in the "off" position.
以上就是問(wèn)題解答的相關(guān)內容了,希望能夠幫助到大家,如對這一問(wèn)題還存在任何疑問(wèn),都歡迎關(guān)注我們網(wǎng)站
http://m.jackpetty.net并咨詢(xún)我們的工作人員,將竭誠為您服務(wù)。
The above is the relevant content of the question answer. I hope it can help you. If you still have any questions about this problem, you are welcome to follow our website http://m.jackpetty.net And consult our staff, will serve you wholeheartedly.